Islamabad Real Estate
Buy, sell, rentals and lease of property, land, houses, flats, shops in Rawalpindi and Islamabad.
|
| Author |
Message |
|
|
|
property-sale
Junior PK Member
Joined: 05 Nov 2007 Posts: 74 Location: Punjab |
|
| ZONE V - ISLAMABAD |
|
FUTURE PLANS - ZONE V - ISLAMABAD
FUTURE PLANS - ZONE V - ISLAMABAD
OPF since its inception has provided more than 10,000 residential plots to overseas Pakistanis all over the country and has now planned to offer constructed houses in four housing schemes in Islamabad, Rawalpindi and Lahore.
The expression of interest (EOI) for development of the housing schemes on Joint Venture basis was invited from local and international developers through press. Twenty-two developers/firms submitted their credentials, out of which six developers/firms were pre-qualified.
The financial and technical proposals from six pre-qualified firms were invited.
The last date of submission of financial and technical proposals is 10th April, 2007.The proposals will be opened on the same day
SALIENT FEATURES ZONE V
Size of Scheme
5000 Kanals
Location
Situated at a prime location on Japan Road, ICT, Zone-V, Islamabad.
Proximity of the scheme
T
he scheme is adjacent to the Naval Officers’ Housing “Anchorage Sihala”
Access to the scheme
The scheme is presently accessible through Japan Road, however, land for construction of 200 ft wide dual carriageway has been earmarked in the Master Plan of the scheme prepared by the consultants M/s NESPAK
Planning/Designing
Completed by NESPAK.
Details of Plots (Residential)
2246 plots of various categories
Land Use Distribution
(As per CDA By – Laws)
Residential
42.80 %
Commercial/parking
4.66%
Public buildings
05.36 %
Parks/Green/Lake
19.18 %
Grave Yards
02.01 %
Roads/Streets
25.99 %
100 %
Commercial
100 Kanals
Size of Roads
Dual carriageways of 200 ft, 100 ft and 80 ft width are provided around commercial areas, public buildings, green areas whereas 60 ft and 40 ft wide roads are mostly provided in residential areas.
Source of Water Supply
To be pumped from 5 proposed tube wells situated at a distance of 6 Km from the scheme along right bank of Swan river.
Source to Dispose off the sewage
The sewage will be disposed off in the natural rain water drain passing through the scheme after primary treatment in the Sewage Treatment Plant.
Category of Houses
Two categories ( 600 Sq Yds and 355 Sq Yds) have been proposed.
Design of Houses
Four (4) design will be adopted.
Accommodation of Houses
4 beds (Ground +1) for 355 Sq Yds and 6 beds for 600 SqYds
Commercial Areas
Will be developed/constructed by the developers simultaneously with the development of the scheme and construction of houses.
Development works to be undertaken
Site preparation and earth works, road and retaining structures, bridges and culverts, water distribution and storage system, sewerage networks, storm water drainage system, dams and lakes, horticulture and land scaping, water supply works, sewage treatment plant, External underground electrification and grid station, Sui gas works ,optic fibre telephone lines.
Civic Amenities included in Master Plan
Schools, Colleges, Health Centers, Mosques, Petrol/ CNG station, Play Grounds, Green areas, Lake/entertainment areas, post office, parking areas, graveyards, telephone exchange, club/community center, public toilets, waiting sheds and site office.
Construction work to be undertaken
Besides buildings for certain Civic amenities, houses and commercial areas will also be constructed.
Completion Period
30 Months
STATUS OF OPF VALLEY ZONE-V, ISLAMABAD
We keep on receiving queries on the progress in development of OPF Valley Zone-V, Islamabad. Since the development of scheme has been delayed for quite some time, we have felt it necessary to apprise you of the progress of the same.
Acquisition and purchase of 5000 Kanals of land has been completed.
Some portions (about 500 Kanals) were under litigations and were the major cause of delay.
It has been decided to start development of the housing scheme without waiting for the resolution of the land under litigation. While the development works goes on towards its completion the matter under litigation will, hopefully, get resolved. Even with exclusion of this area we have ample land for plots allotted to you are absolutely intact.
We have the consultant (M/S NESPAK) in place. The selection of the contractors etc. is under process and will be completed soon.
We can hope earnestly that by the grace of God development works will be in full swing in the going year and in a couple of years the scheme would be complete.
If need any information about ZONE -V you can contect us at islamabad realstate.
|
|
| Fri Nov 09, 2007 11:25 am |
|
 |
|
|
|