Islamabad Real Estate
Buy, sell, rentals and lease of property, land, houses, flats, shops in Rawalpindi and Islamabad.
|
| Author |
Message |
|
|
|
property-sale
Junior PK Member
Joined: 05 Nov 2007 Posts: 74 Location: Punjab |
|
| Rawat Housing Scheme |
|
FUTURE PLANS - RAWAT RAWALPINDI
Since its inception has provided more than 10,000 residential plots to overseas Pakistanis all over the country and has now planned to offer constructed houses in four housing schemes in Islamabad, Rawalpindi and Lahore.
The expression of interest (EOI) for development of the housing schemes on Joint Venture basis was invited from local and international developers through press. Twenty-two developers/firms submitted their credentials, out of which six developers/firms were pre-qualified.
The financial and technical proposals from six pre-qualified firms were invited.
The last date of submission of financial and technical proposals is 10th April, 2007.The proposals will be opened on the same day
SALIENT FEATURES OF RAWAT SCHEME
Size of Scheme
755 Kanals
Location
Situated at a prime location on Kallar Syedan Road, Rawat, Rawalpindi.
Access to the Scheme
Main Kallar Syedan Road, 01 Km from GT Road, Rawalpindi.
Planning/Designing
Yet to be carried out.
Land Use Distribution
As per RDA By – Laws
Size of Roads
40 feet and 60 feet wide roads will be proposed.
Source to Dispose off the sewage
Semi Treated affluent will be of scheme disposed off to the drain passing through the scheme
Category of Houses
Town houses of two categories.
Design of Houses
Four (4) design will be adopted.
Accommodation of Houses
4 beds (Ground +1) for 355 Sq Yds and 6 beds for 600 Sq Yds
Commercial Areas
Will be developed/constructed by the developers simultaneously with the development of the scheme and construction of farm houses.
Development works to be undertaken
Earth works, Pavement/culverts roads and road retaining structures, storm water drainage, water supply system, sewerage networks, Landscaping. Sewage Disposal station, Electrification and Sui Gas works.
Civic Amenities to be included
School/College, Mosque, Parks Play Grounds, Green areas, Entertainment area, Parking etc.
Construction work to be undertaken
Besides buildings for certain Civic amenities, town houses will be constructed.
Completion Period.
24 months.
|
|
| Thu Nov 08, 2007 12:22 pm |
|
 |
|
|
|